Drax Power Station

Sector: Process Sites

TDC replaced three steam calorifiers, in service for over 50 years, at one of the UK’s largest power stations, acting as lead contractor for design, procurement and installation of the new system.

View Case Study

Learn more

Emergency Chiller Replacement – Airbus UK, Broughton

Sector: Aerospace & Manufacturing

TDC restored a failed production chiller at Airbus UK Broughton within eight hours of an emergency call-out, keeping manufacturing operations running with minimal disruption.

View Case Study

Learn more

Critical Extract System Recovery – Trinity Leeds

Sector: Retail & Leisure

TDC resolved a complete extract fan failure at Trinity Leeds within 24 hours, restoring kitchen operations across the shopping centre after both fans failed without warning.

View Case Study

Learn more

Building 85 Air Conditioning Project – Airbus UK, Broughton

Sector: Aerospace & Manufacturing

TDC designed and installed a new VRF air conditioning and heat recovery ventilation system at Airbus UK Broughton’s Design Office, cutting CO₂ levels and removing gas dependency entirely.

View Case Study

Learn more

The Reserve at Chester Zoo – HVAC Installation

Sector: Leisure & Tourism

TDC delivered the complete air conditioning installation for The Reserve at Chester Zoo, a premium new development providing year-round comfort for guests.

View Case Study

Learn more

Eckersley Mill – Commercial Office Refurbishment

Sector: Commercial Offices

TDC installed and commissioned a Mitsubishi Electric heat recovery VRF system across all four floors of the newly refurbished Eckersley Mill development.

View Case Study

Learn more