Case Studies
Real projects for clients including Airbus, CBRE, the NHS and BAM.
Drax Power Station
Sector: Process Sites
TDC replaced three steam calorifiers, in service for over 50 years, at one of the UK’s largest power stations, acting as lead contractor for design, procurement and installation of the new system.
Emergency Chiller Replacement – Airbus UK, Broughton
Sector: Aerospace & Manufacturing
TDC restored a failed production chiller at Airbus UK Broughton within eight hours of an emergency call-out, keeping manufacturing operations running with minimal disruption.
Critical Extract System Recovery – Trinity Leeds
Sector: Retail & Leisure
TDC resolved a complete extract fan failure at Trinity Leeds within 24 hours, restoring kitchen operations across the shopping centre after both fans failed without warning.
Building 85 Air Conditioning Project – Airbus UK, Broughton
Sector: Aerospace & Manufacturing
TDC designed and installed a new VRF air conditioning and heat recovery ventilation system at Airbus UK Broughton’s Design Office, cutting CO₂ levels and removing gas dependency entirely.
The Reserve at Chester Zoo – HVAC Installation
Sector: Leisure & Tourism
TDC delivered the complete air conditioning installation for The Reserve at Chester Zoo, a premium new development providing year-round comfort for guests.
Eckersley Mill – Commercial Office Refurbishment
Sector: Commercial Offices
TDC installed and commissioned a Mitsubishi Electric heat recovery VRF system across all four floors of the newly refurbished Eckersley Mill development.